The Pay Desk is the free weekly executive pay briefing — one company at a time, every number traceable to a public filing.You’ll confirm on The Pay Desk’s sign-up page.
Watershed · by permit class
General discharge permits in subbasin 10060002
- 39Permits
- 41Permits in the subbasin
- 1States the subbasin touches
39 of the 41 Clean Water Act discharge permits in hydrologic subbasin 10060002 are filed as General. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in MT.
A cut is one value of one dimension of a subbasin — General, under permit class. This page holds the permits in subbasin 10060002 that carry that value: 39 of the 41 the subbasin holds, and the 3 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- MT 41 permits in the subbasin
Other cuts of subbasin 10060002
- program: Storm Water Construction 37
- major or minor: Minor dischargers 36
- permit type: General permit coverage 39
Every discharge permit in subbasin 10060002 →
Figures from EPA’s ICIS-NPDES download.