EPA · subbasin 10070006 · discharge permits by parameter
BOD, 5-day, percent removal in subbasin 10070006
- 4Permits carrying a limit
- 4With a recorded exceedance
- 3,963Nationwide
A subbasin is a unit of the national Watershed Boundary Dataset, and water crosses state lines: a permit is placed here by the outfall EPA names as its representative discharge point.
4 of the permits in subbasin 10070006 carry a numeric limit on BOD, 5-day, percent removal, and 4 of those have a recorded exceedance. Nationwide the same parameter appears in 3,963 permits. A permit carrying several parameters is counted under each of them, so the parameter counts for one subbasin add up to more permits than it holds. The other parameters named in this subbasin are listed below.
Permits
Other pollutants in subbasin 10070006
- Turbidity 3
- Specific conductance 7
- BOD, 5-day, 20 deg. C 6
- pH 12
- Solids, total suspended 11
- Oil and grease, hexane extr method 5
- Oil & Grease 3
- Nitrogen, total [as N] 6
- Nitrogen, ammonia total [as N] 7
- Nitrogen, Kjeldahl, total [as N] 6
- Nitrite + Nitrate total [as N] 6
- Phosphorus, total [as P] 6
- Sulfide, total [as S] 4
- Sulfate, total [as SO4] 6
- Radium 226, total 4
- E. coli, MTEC-MF 4
- Chloride 4
- Flow 8
- Produced water, oil and grease 6
- Oil and grease visual 5
BOD, 5-day, percent removal nationwide · Subbasin 10070006, every permit
What this page shows
This page covers Clean Water Act discharge permits in watershed 10070006 with limits on the pollutant parameter BOD, 5-day, percent removal. The figures listed are 4 permits in this watershed with a limit on this parameter and 5 permits in this watershed with a recorded violation of this parameter.