Watershed · by permit class
General discharge permits in subbasin 10110102
- 40Permits
- 41Permits in the subbasin
- 1States the subbasin touches
40 of the 41 Clean Water Act discharge permits in hydrologic subbasin 10110102 are filed as General. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in ND.
A cut is one value of one dimension of a subbasin — General, under permit class. This page holds the permits in subbasin 10110102 that carry that value: 40 of the 41 the subbasin holds, and the 4 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- ND 41 permits in the subbasin
Other cuts of subbasin 10110102
- program: Storm Water Construction 17
- program: Storm Water Industrial 3
- major or minor: Minor dischargers 41
- permit type: General permit coverage 40
Every discharge permit in subbasin 10110102 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 10110102. The page lists 40 permits. The whole watershed located in ND has 41 permits.