Watershed · by program
Storm Water Construction discharge permits in subbasin 10120106
- 5Permits
- 14Permits in the subbasin
- 2States the subbasin touches
5 of the 14 Clean Water Act discharge permits in hydrologic subbasin 10120106 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in SD, WY.
Where the subbasin lies
Other cuts of subbasin 10120106
- major or minor: Minor dischargers 14
- permit type: General permit coverage 9
- permit type: Individual permits 5
Every discharge permit in subbasin 10120106 →
Figures from EPA’s ICIS-NPDES download.