EPA · subbasin 10120201 · discharge permits by parameter
BOD, 5-day, percent removal in subbasin 10120201
- 3Permits carrying a limit
- 2With a recorded exceedance
- 3,963Nationwide
A subbasin is a unit of the national Watershed Boundary Dataset, and water crosses state lines: a permit is placed here by the outfall EPA names as its representative discharge point.
3 of the permits in subbasin 10120201 carry a numeric limit on BOD, 5-day, percent removal, and 2 of those have a recorded exceedance. Nationwide the same parameter appears in 3,963 permits. A permit carrying several parameters is counted under each of them, so the parameter counts for one subbasin add up to more permits than it holds. The other parameters named in this subbasin are listed below.
Permits
Other pollutants in subbasin 10120201
- Sodium adsorption ratio 41
- Sulfate, total [as SO4] 11
- Arsenic, total recoverable 41
- Selenium, total recoverable 4
- Barium, total recoverable 40
- Copper, dissolved [as Cu] 4
- Iron, total [as Fe] 5
- Iron, dissolved [as Fe] 47
- Radium 226, total 14
- Radium 226 + radium 228, total 8
- Chloride 62
- Duration 13
- Chlorine, total residual 9
- E. coli 5
- Sulfide-hydrogen sulfide [undissociated] 3
- Bicarbonate as [CaCO3] 41
- Solids, total dissolved 9
- Flow 79
- Sulfate 8
- Produced water, oil and grease 29
BOD, 5-day, percent removal nationwide · Subbasin 10120201, every permit
What this page shows
This page covers Clean Water Act discharge permits in watershed 10120201 with limits on BOD, 5-day, percent removal. There are 3 permits in this watershed with a limit on this parameter, and 3 permits in this watershed with a recorded violation of this parameter.