Watershed · by program
Storm Water Construction discharge permits in subbasin 10120203
- 46Permits
- 61Permits in the subbasin
- 2States the subbasin touches
46 of the 61 Clean Water Act discharge permits in hydrologic subbasin 10120203 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in SD, WY.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 10120203 that carry that value: 46 of the 61 the subbasin holds, and the 5 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 10120203
- program: POTW 3
- program: Storm Water Industrial 3
- major or minor: Minor dischargers 58
- permit type: General permit coverage 54
- permit type: Individual permits 6
Every discharge permit in subbasin 10120203 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 10120203 under the Storm Water Construction program. It lists 46 permits on this page. The whole watershed has 55 permits in SD, 6 permits in WY, and 61 permits across all cuts.