Watershed · by program
Storm Water Construction discharge permits in subbasin 10130201
- 30Permits
- 75Permits in the subbasin
- 1States the subbasin touches
30 of the 75 Clean Water Act discharge permits in hydrologic subbasin 10130201 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in ND.
Where the subbasin lies
- ND 75 permits in the subbasin
Other cuts of subbasin 10130201
- major or minor: Minor dischargers 74
- permit type: General permit coverage 66
- program: POTW 12
- permit type: Individual permits 9
- program: Storm Water Industrial 9
Every discharge permit in subbasin 10130201 →
Figures from EPA’s ICIS-NPDES download.