Watershed · by program
Storm Water Construction discharge permits in subbasin 10130203
- 18Permits
- 36Permits in the subbasin
- 1States the subbasin touches
18 of the 36 Clean Water Act discharge permits in hydrologic subbasin 10130203 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in ND.
Where the subbasin lies
- ND 36 permits in the subbasin
Other cuts of subbasin 10130203
- program: POTW 8
- program: Storm Water Industrial 3
- major or minor: Minor dischargers 36
- permit type: General permit coverage 34
Every discharge permit in subbasin 10130203 →
Figures from EPA’s ICIS-NPDES download.