Watershed · by program
Storm Water Construction discharge permits in subbasin 11020005
- 6Permits
- 64Permits in the subbasin
- 1States the subbasin touches
6 of the 64 Clean Water Act discharge permits in hydrologic subbasin 11020005 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in CO.
Where the subbasin lies
- CO 64 permits in the subbasin
Other cuts of subbasin 11020005
- program: POTW 5
- program: Storm Water Industrial 12
- major or minor: Minor dischargers 59
- permit type: General permit coverage 56
- permit type: Individual permits 6
Every discharge permit in subbasin 11020005 →
Figures from EPA’s ICIS-NPDES download.