Watershed · by program
Storm Water Construction discharge permits in subbasin 11130101
- 18Permits
- 28Permits in the subbasin
- 2States the subbasin touches
18 of the 28 Clean Water Act discharge permits in hydrologic subbasin 11130101 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in TX, OK.
Where the subbasin lies
Other cuts of subbasin 11130101
- major or minor: Minor dischargers 28
- permit type: General permit coverage 25
- permit type: Individual permits 3
- program: POTW 3
- program: Storm Water Industrial 3
Every discharge permit in subbasin 11130101 →
Figures from EPA’s ICIS-NPDES download.