Follow this watershed Velarion Records emails you this watershed’s record, cited to the public filing, and tells you when the register changes it. Free.We’ll email you a link to confirm. The continuous daily watch on every change is the paid alert. Unsubscribe any time.
EPA · discharge permits by watershed
Watershed 1207010106
- 46Current permits
- 1States
- 3Subwatersheds
A watershed is a unit of the national Watershed Boundary Dataset, and water crosses state lines: this one carries permits in Texas. Each permit is placed by the outfall EPA names as its representative discharge point.
This watershed contains 3 subwatersheds, each with its own page of permits. The table below is a sample of the 46 current permits recorded here
By state
- Texas46
Subwatersheds inside this watershed
Other watersheds
- Watershed 1207010101 44
- Watershed 1207010102 6
- Watershed 1207010104 15
- Watershed 1207010105 12
- Watershed 1207010107 148
- Watershed 1207010108 41
- Watershed 1207010109 26
Permits discharging here
| Permit holder | NPDES ID | City | State | Program | Discharger | Receiving water |
|---|---|---|---|---|---|---|
| CITY OF HEARNE WWTP 2 | TX0025879 | HEARNE | TX | Publicly owned treatment works | Major | UNNAMED DITCH;LITTLE BRAZOS RV;BRAZOS ABOVE NAVASO |
| ROLAND C DANSBY SES | TX0073954 | BRYAN | TX | Major | DRAINAGE DITCH;ELM CK;PEACH CK;CAMPBELLS CK | |
| 7 ELEVEN HEARNE | TXR1508JS | HEARNE | TX | Construction stormwater | Minor | SANDY CREEK |
| AXIS PIPE AND TUBE | TXR05FD05 | BRYAN | TX | Industrial stormwater | Minor | Peach Creek-Brazos River |
| BCDC ALIAS TEXAS HANGAR | TXR1576YV | BRYAN | TX | Construction stormwater | Minor | BRAZOS RIVER ABOVE NAVASOTA RIVER |
| BPI PIT | TXR05FS85 | BRYAN | TX | Industrial stormwater | Minor | Damn Branch-Brazos River |
| BUILDERS FIRSTSOURCE - HEARTXMF | TXR05GN11 | HEARNE | TX | Industrial stormwater | Minor | Lost Creek-Brazos River |
| CCL 24267 - WELLS 10 11 12 AND WELL COLLECTION PIPELINE | TXR1554VB | BRYAN | TX | Construction stormwater | Minor | LITTLE BRAZOS RIVER |
| CEDAR BLUFFS SUBDIVISION | TXR1501NI | GATESVILLE | TX | Construction stormwater | Minor | COTTONWOOD CREEK |
| CITY OF CALVERT WWTP | TX0054020 | CALVERT | TX | Publicly owned treatment works | Minor | TIDWELL CRK;SANDY CRK;MUD CRK;LITTLE BRAZOS RIV;BR |
| CITY OF FRANKLIN WWTP | TX0021318 | FRANKLIN | TX | Publicly owned treatment works | Minor | TRIB (X2);MUD CREEK;LITTLE BRAZOS CREEK;BRAZOS RIV |
| CITY OF HEARNE WASTEWATER TREATMENT PLANT | TXR05FO63 | HEARNE | TX | Industrial stormwater | Minor | Lost Creek-Brazos River |
| CITY OF MILANO ROADWAY AND DRAINAGE IMPROVEMENTS | TXR1556OW | MILANO | TX | Construction stormwater | Minor | CEDAR CREEK |
| COASTAL TRANSPORT HEARNE | TXR05FO93 | HEARNE | TX | Industrial stormwater | Minor | Lost Creek-Brazos River |
| GATEWAY ENTRANCE SIGNS PH 1 - HIGHWAY 21 | TXR1581OP | BRYAN | TX | Construction stormwater | Minor | LITTLE BRAZOS RIVER |
| GATEWAY ENTRANCE SIGNS PH 1 - HIGHWAY 6 | TXR1582OP | BRYAN | TX | Construction stormwater | Minor | PEACH CREEK |
| GATX HEARNE RAIL EXPANSION PROJECT | TXR1520VZ | HEARNE | TX | Construction stormwater | Minor | LITTLE BRAZOS RIVER |
| GATX-HEARNE SERVICE CENTER | TXR05FB96 | HEARNE | TX | Industrial stormwater | Minor | Lost Creek-Brazos River |
| GAUSE ISD MP BLDG CLASSROOM & BOND RENO | TXR1530VG | GAUSE | TX | Construction stormwater | Minor | THREEMILE CREEK |
| GLOBAL COMPANIES - HEARNE TERMINAL | TXR05GH57 | HEARNE | TX | Industrial stormwater | Minor | Lost Creek-Brazos River |
| HEARNE ELEMENTARY GYMNASIUM | TXR1545XI | HEARNE | TX | Construction stormwater | Minor | LOST CREEK |
| HEARNE HAULING | TXR05GA71 | HEARNE | TX | Industrial stormwater | Minor | Lost Creek-Brazos River |
| HEARNE MAINTENANCE FACILITY | TXR05HC32 | HEARNE | TX | Industrial stormwater | Minor | Lost Creek-Brazos River |
| HEARNE MUNICIPAL AIRPORT | TXR05FO64 | HEARNE | TX | Industrial stormwater | Minor | Lost Creek-Brazos River |
| IRON OAK RESERVE | TXR1544TY | HEARNE | TX | Construction stormwater | Minor | LITTLE BRAZOS RIVER |
| LAST ENERGY | TXR1514XV | BRYAN | TX | Construction stormwater | Minor | BRAZOS RIVER ABOVE NAVASOTA RIVER |
| LOST CREEK STORE | TXR1599MF | HEARNE | TX | Construction stormwater | Minor | LITTLE BRAZOS RIVER |
| MERRYMAN SUBSTATION | TXR1543YU | HEARNE | TX | Construction stormwater | Minor | DELAWARE CREEK |
| MILANO SOLAR PROJECT | TXR1505VY | MILANO | TX | Construction stormwater | Minor | HARPERS BRANCH |
| POWERHOUSE | TXR1550XV | BRYAN | TX | Construction stormwater | Minor | BRAZOS RIVER ABOVE NAVASOTA RIVER |
| RELLIS CAMPUS DATA AND RESEARCH CENTER | TXR1568VM | BRYAN | TX | Construction stormwater | Minor | THOMPSONS CREEK |
| RELLIS DATA AND RESEARCH CENTER | TXR1508NS | BRYAN | TX | Construction stormwater | Minor | THOMPSONS CREEK |
| TAMU SEMICONDUCTOR INSTITUTE | TXR1546XF | BRYAN | TX | Construction stormwater | Minor | BRAZOS RIVER |
| TRAVIS MATERIALS MUMFORD PLANT | TXR05FY62 | HEARNE | TX | Industrial stormwater | Minor | Lost Creek-Brazos River |
| TRAVIS MATERIALS MUMFORD PLANT | TXR05HC54 | HEARNE | TX | Industrial stormwater | Minor | Lost Creek-Brazos River |
| TXDOT BRY CSJ 0204-09-045 | TXR1501TV | HEARNE | TX | Construction stormwater | Minor | LITTLE BRAZOS RIVER |
| TXDOT BRY CSJ 0204-09-045 | TXR1514TJ | HEARNE | TX | Construction stormwater | Minor | LITTLE BRAZOS RIVER |
| TXDOT BRY CSJ 0648-01-036 | TXR1522VG | MUMFORD | TX | Construction stormwater | Minor | LITTLE BRAZOS RIVER |
| TXDOT BRY CSJ 0648-01-036 | TXR1569VG | MUMFORD | TX | Construction stormwater | Minor | LITTLE BRAZOS RIVER |
| UNION PACIFIC RAILROAD BRAZOS YARD | TXR05GP93 | HEARNE | TX | Industrial stormwater | Minor | Peach Creek-Brazos River |
What this page shows
This page covers Clean Water Act discharge permits in watershed 1207010106. The page lists 46 permits, and 46 permits in the whole watershed are located in TX.