Watershed · by program
Storm Water Construction discharge permits in subbasin 12070103
- 331Permits
- 416Permits in the subbasin
- 1States the subbasin touches
331 of the 416 Clean Water Act discharge permits in hydrologic subbasin 12070103 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in TX.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 12070103 that carry that value: 331 of the 416 the subbasin holds, and the 6 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- TX 416 permits in the subbasin
Other cuts of subbasin 12070103
- program: POTW 24
- program: Storm Water Industrial 33
- major or minor: Major dischargers 7
- major or minor: Minor dischargers 407
- permit type: General permit coverage 372
- permit type: Individual permits 44
Every discharge permit in subbasin 12070103 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 12070103 under the Storm Water Construction program. It shows 331 permits for Storm Water Construction, out of 416 permits in the whole watershed in TX and 416 permits in the whole watershed across all cuts.