Watershed · by program
Storm Water Construction discharge permits in subbasin 12090401
- 78Permits
- 149Permits in the subbasin
- 1States the subbasin touches
78 of the 149 Clean Water Act discharge permits in hydrologic subbasin 12090401 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in TX.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 12090401 that carry that value: 78 of the 149 the subbasin holds, and the 5 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- TX 149 permits in the subbasin
Other cuts of subbasin 12090401
- program: POTW 14
- program: Storm Water Industrial 25
- major or minor: Minor dischargers 139
- permit type: General permit coverage 110
- permit type: Individual permits 39
Every discharge permit in subbasin 12090401 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 12090401 by the program they are issued under. The page lists 78 Storm Water Construction permits in the watershed located in TX, against 149 permits in the whole watershed.