EPA · discharge permits by watershed
Subbasin 13070003
- 8Current permits
- 1States
- 2Watersheds
A subbasin is a unit of the national Watershed Boundary Dataset, and water crosses state lines: this one carries permits in Texas. Each permit is placed by the outfall EPA names as its representative discharge point.
By state
Watersheds inside this subbasin
Permits discharging here
| Permit holder | NPDES ID | City | State | Program | Discharger | Receiving water |
|---|---|---|---|---|---|---|
| CANTALOUPE SOLAR | TXR1566WY | BALMORHEA | TX | Construction stormwater | Minor | CHERRY CREEK |
| CHERRY CREEK AGGREGATES SARAGOSA PIT | TXR05GW88 | SARAGOSA | TX | Industrial stormwater | Minor | Prizer Draw-Casey Draw |
| CRAZY J MATERIAL SOURCE | TXR05GI19 | BALMORHEA | TX | Industrial stormwater | Minor | Middle Cherry Creek |
| DBR EXPANSION PIPELINE - PECOS 3 DISCHARGE 2 | TXG670662 | PECOS | TX | Minor | League Well-Toyah Creek | |
| FLYCATCHER SUBSTATION | TXR1578YC | PECOS | TX | Construction stormwater | Minor | PECOS RIVER |
| TXDOT ODA CSJ 1639-01-016 ETC REEVES CO | TXR1528OG | PECOS | TX | Construction stormwater | Minor | HUCKBERRY DRAW |
| TXDOT ODA CSJ 1639-01-016 ETC REEVES CO | TXR1523OG | PECOS | TX | Construction stormwater | Minor | HACKBERRY DRAW |
| VERHALEN SUBSTATION TO CHERRY CREEK TAP | TXR1542XW | VERHALEN | TX | Construction stormwater | Minor | UPPER PECOS RIVER |