Watershed · by program
Storm Water Construction discharge permits in subbasin 13090002
- 4Permits
- 13Permits in the subbasin
- 1States the subbasin touches
4 of the 13 Clean Water Act discharge permits in hydrologic subbasin 13090002 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in TX.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 13090002 that carry that value: 4 of the 13 the subbasin holds, and the 3 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- TX 13 permits in the subbasin
Other cuts of subbasin 13090002
- program: Storm Water Industrial 8
- major or minor: Minor dischargers 12
- permit type: General permit coverage 12
Every discharge permit in subbasin 13090002 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 13090002 under the Storm Water Construction program. It lists 4 permits on this page, out of 13 permits in the whole watershed located in TX.