EPA · subbasin 15070101 · discharge permits by parameter
BOD, 5-day, percent removal in subbasin 15070101
- 6Permits carrying a limit
- 2With a recorded exceedance
- 3,963Nationwide
A subbasin is a unit of the national Watershed Boundary Dataset, and water crosses state lines: a permit is placed here by the outfall EPA names as its representative discharge point.
6 of the permits in subbasin 15070101 carry a numeric limit on BOD, 5-day, percent removal, and 2 of those have a recorded exceedance. Nationwide the same parameter appears in 3,963 permits. A permit carrying several parameters is counted under each of them, so the parameter counts for one subbasin add up to more permits than it holds. The other parameters named in this subbasin are listed below.
Permits
Other pollutants in subbasin 15070101
- Pentachlorophenol 3
- Di[2-ethylhexyl] phthalate [DEHP] 3
- Di-n-butyl phthalate 3
- Benzidine 5
- Vinyl chloride 3
- Trichloroethylene 3
- Hexachlorobenzene 3
- Flow, in conduit or thru treatment plant 7
- Chlorine, total residual 7
- E. coli, colony forming units [CFU] 6
- 4-Chloro-3-methylphenol 3
- Solids, total dissolved 5
- Hydrogen sulfide 5
- Mercury, total recoverable 7
- 1,3-Dichloropropene 3
- Solids, suspended percent removal 6
- Chloroethane 3
- TU Static 4 Day Chronic Raphidocelis subcapitata (formerly Selenastrum capricornutum) 4
- Static 7Day Chronic Pimephales Promelas 4
- TU Static Renewal 7-Day Chronic Ceriodaphnia dubia 4
BOD, 5-day, percent removal nationwide · Subbasin 15070101, every permit
What this page shows
This page covers Clean Water Act discharge permits in watershed 15070101 with limits on the pollutant parameter BOD, 5-day, percent removal. It lists 6 permits in this watershed with a limit on this parameter and 3 permits in this watershed with a recorded violation of this parameter.