Watershed · by program
Storm Water Construction discharge permits in subbasin 16010101
- 29Permits
- 48Permits in the subbasin
- 2States the subbasin touches
29 of the 48 Clean Water Act discharge permits in hydrologic subbasin 16010101 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in UT, WY.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 16010101 that carry that value: 29 of the 48 the subbasin holds, and the 4 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
Other cuts of subbasin 16010101
- program: Storm Water Industrial 6
- major or minor: Minor dischargers 46
- permit type: General permit coverage 42
- permit type: Individual permits 5
Every discharge permit in subbasin 16010101 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page lists Clean Water Act discharge permits in watershed 16010101 by the program they are issued under. It shows 29 Storm Water Construction permits, out of 48 permits in the whole watershed, with 34 in UT and 14 in WY.