Watershed · by program
POTW discharge permits in subbasin 16020102
- 6Permits
- 3,214Permits in the subbasin
- 1States the subbasin touches
6 of the 3,214 Clean Water Act discharge permits in hydrologic subbasin 16020102 are filed as POTW. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in UT.
A cut is one value of one dimension of a subbasin — POTW, under program. This page holds the permits in subbasin 16020102 that carry that value: 6 of the 3,214 the subbasin holds, and the 6 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- UT 3,214 permits in the subbasin
Other cuts of subbasin 16020102
- program: Storm Water Construction 2,848
- program: Storm Water Industrial 133
- major or minor: Major dischargers 3
- major or minor: Minor dischargers 3,161
- permit type: General permit coverage 3,196
- permit type: Individual permits 17
Every discharge permit in subbasin 16020102 →
Figures from EPA’s ICIS-NPDES download.
The Pay Desk is the free weekly executive pay briefing — one company at a time, every number traceable to a public filing.We’ll email you a link to confirm. Unsubscribe any time.