Watershed · by program
Storm Water Construction discharge permits in subbasin 17010101
- 26Permits
- 75Permits in the subbasin
- 1States the subbasin touches
26 of the 75 Clean Water Act discharge permits in hydrologic subbasin 17010101 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in MT.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 17010101 that carry that value: 26 of the 75 the subbasin holds, and the 6 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- MT 75 permits in the subbasin
Other cuts of subbasin 17010101
- program: POTW 5
- program: Storm Water Industrial 11
- major or minor: Minor dischargers 61
- permit type: General permit coverage 61
- permit type: Individual permits 8
- permit type: State-issued individual permits 6
Every discharge permit in subbasin 17010101 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 17010101, listed by program. It shows 26 Storm Water Construction permits. The whole watershed in MT has 75 permits, and all cuts together total 75.