Watershed · by program
Storm Water Construction discharge permits in subbasin 17010212
- 37Permits
- 52Permits in the subbasin
- 1States the subbasin touches
37 of the 52 Clean Water Act discharge permits in hydrologic subbasin 17010212 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in MT.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 17010212 that carry that value: 37 of the 52 the subbasin holds, and the 4 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- MT 52 permits in the subbasin
Other cuts of subbasin 17010212
- program: POTW 5
- major or minor: Minor dischargers 41
- permit type: General permit coverage 45
- permit type: Individual permits 7
Every discharge permit in subbasin 17010212 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 17010212 by program. It lists 37 Storm Water Construction permits. The whole watershed in MT has 52 permits, and 52 permits in the whole watershed across all cuts together.