Watershed · by program
Storm Water Construction discharge permits in subbasin 17060107
- 9Permits
- 26Permits in the subbasin
- 1States the subbasin touches
9 of the 26 Clean Water Act discharge permits in hydrologic subbasin 17060107 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in WA.
Where the subbasin lies
- WA 26 permits in the subbasin
Other cuts of subbasin 17060107
- major or minor: Minor dischargers 25
- permit type: General permit coverage 21
- permit type: Individual permits 4
Every discharge permit in subbasin 17060107 →
Figures from EPA’s ICIS-NPDES download.