Watershed · by program
Storm Water Construction discharge permits in subbasin 17100103
- 84Permits
- 202Permits in the subbasin
- 1States the subbasin touches
84 of the 202 Clean Water Act discharge permits in hydrologic subbasin 17100103 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in WA.
Where the subbasin lies
- WA 202 permits in the subbasin
Other cuts of subbasin 17100103
- major or minor: Minor dischargers 195
- permit type: General permit coverage 185
- permit type: Individual permits 15
- program: POTW 6
- major or minor: Major dischargers 4
Every discharge permit in subbasin 17100103 →
Figures from EPA’s ICIS-NPDES download.