Watershed · by program
Storm Water Construction discharge permits in subbasin 17100104
- 15Permits
- 57Permits in the subbasin
- 1States the subbasin touches
15 of the 57 Clean Water Act discharge permits in hydrologic subbasin 17100104 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in WA.
Where the subbasin lies
- WA 57 permits in the subbasin
Other cuts of subbasin 17100104
- program: POTW 3
- major or minor: Minor dischargers 55
- permit type: General permit coverage 51
- permit type: Individual permits 5
Every discharge permit in subbasin 17100104 →
Figures from EPA’s ICIS-NPDES download.