Watershed · by program
Storm Water Construction discharge permits in subbasin 18010209
- 3Permits
- 5Permits in the subbasin
- 1States the subbasin touches
3 of the 5 Clean Water Act discharge permits in hydrologic subbasin 18010209 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in CA.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 18010209 that carry that value: 3 of the 5 the subbasin holds, and the 2 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- CA 5 permits in the subbasin
Every discharge permit in subbasin 18010209 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 18010209 under the Storm Water Construction program. It lists 3 permits on this page, out of 5 permits in the whole watershed located in CA, and 5 permits in the whole watershed with all cuts together.