EPA · subbasin 18040013 · discharge permits by parameter
BOD, 5-day, percent removal in subbasin 18040013
- 3Permits carrying a limit
- 1With a recorded exceedance
- 3,963Nationwide
A subbasin is a unit of the national Watershed Boundary Dataset, and water crosses state lines: a permit is placed here by the outfall EPA names as its representative discharge point.
3 of the permits in subbasin 18040013 carry a numeric limit on BOD, 5-day, percent removal, and 1 of those have a recorded exceedance. Nationwide the same parameter appears in 3,963 permits. A permit carrying several parameters is counted under each of them, so the parameter counts for one subbasin add up to more permits than it holds. The other parameters named in this subbasin are listed below.
Permits
Other pollutants in subbasin 18040013
- PCB-1260 4
- Hexachlorobenzene 4
- 2,4-Dichlorophenoxyacetic acid 3
- 1,2-Dibromo-3-chloropropane 3
- Flow, in conduit or thru treatment plant 4
- Chlorine, total residual 3
- 4-Chloro-3-methylphenol 4
- Solids, total dissolved 3
- Mercury, total recoverable 4
- Coliform, total general 3
- 1,3-Dichloropropene 4
- Ethylene dibromide 3
- 2,4,5-TP 3
- Solids, suspended percent removal 3
- Chlorpyrifos 3
- Styrene 3
- Chloroethane 4
- TU Static 4 Day Chronic Raphidocelis subcapitata (formerly Selenastrum capricornutum) 4
- TU Static Renewal 7-Day Chronic Ceriodaphnia dubia 4
- TU Static Renewal 7-Day Chronic Pimphales promelas 4
BOD, 5-day, percent removal nationwide · Subbasin 18040013, every permit
What this page shows
This page covers Clean Water Act discharge permits in watershed 18040013 with limits on BOD, 5-day, percent removal. It lists 3 permits in this watershed with a limit on this parameter and 2 permits in this watershed with a recorded violation of this parameter.