EPA · subbasin 18070203 · discharge permits by parameter
BOD, 5-day, percent removal in subbasin 18070203
- 8Permits carrying a limit
- 3With a recorded exceedance
- 3,963Nationwide
A subbasin is a unit of the national Watershed Boundary Dataset, and water crosses state lines: a permit is placed here by the outfall EPA names as its representative discharge point.
8 of the permits in subbasin 18070203 carry a numeric limit on BOD, 5-day, percent removal, and 3 of those have a recorded exceedance. Nationwide the same parameter appears in 3,963 permits. A permit carrying several parameters is counted under each of them, so the parameter counts for one subbasin add up to more permits than it holds. The other parameters named in this subbasin are listed below.
Permits
Other pollutants in subbasin 18070203
- Heptachlor 9
- Heptachlor epoxide 9
- PCB-1221 8
- PCB-1232 8
- PCB-1242 8
- PCB-1248 8
- PCB-1254 8
- PCB-1260 8
- Hexachlorobenzene 9
- Flow, in conduit or thru treatment plant 10
- Chlorine, total residual 8
- Cyanide, free available 3
- 4-Chloro-3-methylphenol 8
- Solids, total dissolved 9
- Mercury, total recoverable 10
- Coliform, total general 9
- 1,3-Dichloropropene 10
- Solids, suspended percent removal 9
- Chloroethane 9
- TU Static Renewal 7-Day Chronic Ceriodaphnia dubia 7
BOD, 5-day, percent removal nationwide · Subbasin 18070203, every permit
What this page shows