Watershed · by program
Storm Water Construction discharge permits in subbasin 19020401
- 425Permits
- 570Permits in the subbasin
- 1States the subbasin touches
425 of the 570 Clean Water Act discharge permits in hydrologic subbasin 19020401 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in AK.
A cut is one value of one dimension of a subbasin — Storm Water Construction, under program. This page holds the permits in subbasin 19020401 that carry that value: 425 of the 570 the subbasin holds, and the 6 other cuts of the subbasin are listed at the foot of the page, each with its own count.
Where the subbasin lies
- AK 557 permits in the subbasin
Other cuts of subbasin 19020401
- program: POTW 3
- program: Storm Water Industrial 27
- major or minor: Minor dischargers 533
- permit type: General permit coverage 546
- permit type: Individual permits 9
- permit type: Master general permits 13
Every discharge permit in subbasin 19020401 →
Figures from EPA’s ICIS-NPDES download.
What this page shows
This page covers Clean Water Act discharge permits in watershed 19020401 by program. It lists 425 Storm Water Construction permits, out of 557 permits in the whole watershed located in AK and 570 permits in the whole watershed across all cuts.