EPA · subbasin 20060000 · discharge permits by parameter
Pass/Fail Static 20 Minute Fertilization Chronic Tripneustes gratilla in subbasin 20060000
- 9Permits carrying a limit
- 4With a recorded exceedance
- 18Nationwide
A subbasin is a unit of the national Watershed Boundary Dataset, and water crosses state lines: a permit is placed here by the outfall EPA names as its representative discharge point.
9 of the permits in subbasin 20060000 carry a numeric limit on Pass/Fail Static 20 Minute Fertilization Chronic Tripneustes gratilla, and 4 of those have a recorded exceedance. Nationwide the same parameter appears in 18 permits. A permit carrying several parameters is counted under each of them, so the parameter counts for one subbasin add up to more permits than it holds. The other parameters named in this subbasin are listed below.
Permits
| Permit holder | NPDES ID | City | State | Program | Discharger | Receiving water |
|---|---|---|---|---|---|---|
| C&CH SAND ISLAND WWTP | HI0020117 | HONOLULU | HI | Publicly owned treatment works | Major | PACIFIC OCEAN |
| C&CH HONOULIULI WWTP | HI0020877 | EWA BEACH | HI | Publicly owned treatment works | Major | PACIFIC OCEAN |
| PAR HAWAII REFINERY | HI0000329 | KAPOLEI BUSINESS PARK | HI | Major | PACIFIC OCEAN | |
| JOINT BASE PEARL HARBOR-HICKAM WASTEWATER TREATMENT PLANT | HI0110086 | PEARL HARBOR | HI | Major | PACIFIC OCEAN | |
| MARINE CORPS BASE HAWAII KANEOHE BAY WATER RECLAMATION FACILITY | HI0110078 | KANEOHE | HI | Major | PACIFIC OCEAN | |
| HECO WAIAU GENERATING STATION | HI0000604 | PEARL CITY | HI | Industrial stormwater | Major | PEARL HARBOR, PEARL HARBOR, EAST LOCH |
| KAHE GENERATING STATION (1) | HI0000019 | KAPOLEI | HI | Industrial stormwater | Major | PACIFIC OCEAN |
| HONOLULU GENERATING STATION | HI0000027 | HONOLULU | HI | Industrial stormwater | Major | HONOLULU HARBOR |
| C&CH HONOULIULI WWTP | HI0021954 | EWA BEACH | HI | Publicly owned treatment works | Minor | Kaloi Gulch |
Other pollutants in subbasin 20060000
- 4-Chloro-3-methylphenol 10
- Nitrogen, ammonia total [as NH4] 8
- Mercury, total recoverable 18
- Mercury, total recoverable 3
- 1,3-Dichloropropene 13
- 1,2,4,5-Tetrachlorobenzene 4
- Pentachlorobenzene 4
- N-Nitrosodiethylamine 4
- N-Nitrosopyrrolidine 4
- N-Nitrosodibutylamine 4
- Chromium, hexavalent tot recoverable 3
- Cyanide, total recoverable 3
- BOD, 5-day, percent removal 6
- Solids, suspended percent removal 6
- Chemical Oxygen Demand [COD] 12
- Pentachloroethane 4
- Chromium, hexavalent tot recoverable 3
- Chloroethane 9
- Pass/Fail Static Renewal 7 Day Chronic Ceriodaphnia dubia 3
- Pass/Fail Static Renewal 7 Day Chronic Atherinops affinis 5
Pass/Fail Static 20 Minute Fertilization Chronic Tripneustes gratilla nationwide · Subbasin 20060000, every permit
What this page shows
This page covers Clean Water Act discharge permits in watershed 20060000 with limits on Pass/Fail Static 20 Minute Fertilization Chronic Tripneustes gratilla. It lists 9 permits in this watershed with a limit on this parameter and 7 permits in this watershed with a recorded violation of this parameter.