Watershed · by program
Storm Water Construction discharge permits in subbasin 21010002
- 50Permits
- 147Permits in the subbasin
- 1States the subbasin touches
50 of the 147 Clean Water Act discharge permits in hydrologic subbasin 21010002 are filed as Storm Water Construction. A subbasin is a watershed unit, not a political one, so it crosses state lines: this one is named on permits in PR.
Where the subbasin lies
- PR 147 permits in the subbasin
Other cuts of subbasin 21010002
- program: Biosolids 7
- program: POTW 7
- program: Storm Water Industrial 35
- major or minor: Major dischargers 8
- major or minor: Minor dischargers 114
- permit type: Associated permit records 9
- permit type: General permit coverage 98
- permit type: Individual permits 40
Every discharge permit in subbasin 21010002 →
Figures from EPA’s ICIS-NPDES download.