EPA · subbasin 21010004 · discharge permits by parameter
Lead, total [as Pb] in subbasin 21010004
- 20Permits carrying a limit
- 21With a recorded exceedance
- 7,202Nationwide
A subbasin is a unit of the national Watershed Boundary Dataset, and water crosses state lines: a permit is placed here by the outfall EPA names as its representative discharge point.
20 of the permits in subbasin 21010004 carry a numeric limit on Lead, total [as Pb], and 21 of those have a recorded exceedance. Nationwide the same parameter appears in 7,202 permits. A permit carrying several parameters is counted under each of them, so the parameter counts for one subbasin add up to more permits than it holds. The other parameters named in this subbasin are listed below.
Permits
| Permit holder | NPDES ID | City | State | Program | Discharger | Receiving water | Status and term |
|---|---|---|---|---|---|---|---|
| PUERTO RICO ELECTRIC PWR AUTH | PR0001660 | SALINAS | PR | Major | BAHIA JOBOS |
Other pollutants in subbasin 21010004
- Cyanide, total [as CN] 5
- Sulfide, total [as S] 5
- Sulfate, total [as SO4] 14
- Fluoride, total [as F] 5
- Arsenic, total [as As] 6
- Cadmium, total [as Cd] 10
- Chromium, hexavalent [as Cr] 4
- Chromium, total [as Cr] 3
- Copper, total [as Cu] 31
- Iron, total [as Fe] 5
- Silver, total [as Ag] 4
- Zinc, total [as Zn] 13
- Selenium, total [as Se] 4
- 2-Methyl-4,6-dinitrophenol 3
- Coliform, fecal - % samples exceeding limit 6
- 2-Chlorophenol 4
- 2,4-Dichlorophenol 3
- 2,4-Dimethylphenol 3
- 2,4-Dinitrophenol 3
- 2,4,6-Trichlorophenol 4
Lead, total [as Pb] nationwide · Subbasin 21010004, every permit
What this page shows
This page covers Clean Water Act discharge permits in watershed 21010004 with limits on the pollutant parameter Lead, total [as Pb]. It lists 20 permits in this watershed with a limit on this parameter and 26 permits in this watershed with a recorded violation of this parameter.