EPA Air · stack tests by county and year
Air-emissions stack tests in Fairfield County, Connecticut, 2024
- 22Stack tests
A stack test measures what a source actually emits, at the stack, against the limit in its permit. Each row below is one stack test recorded against a source in Fairfield County, Connecticut during 2024. A facility can appear several times: this is the year’s record of what happened, not a list of places. The sources themselves are on the Fairfield County facility page.
Fairfield County, Connecticut, 2024
Air-emissions stack tests in Fairfield County, other years
Air-emissions stack tests recorded in Fairfield County, Connecticut, 2024
| Date | Facility | Kind | Agency |
|---|---|---|---|
| 2024-10-11 | SIKORSKY AIRCRAFT - MAIN PLANT | Pass | State |
| 2024-08-27 | SPARTECH, L.L.C. | Pass | State |
| 2024-07-10 | SPRAGUE OPERATING RESOURCES, LLC | Pass | State |
| 2024-07-09 | FAIRFIELD UNIVERSITY | Pass | State |
| 2024-06-11 | BOEHRINGER INGELHEIM PHARMACEUTICALS INC | Pass | State |
| 2024-06-05 | TILCON CONNECTICUT - DANBURY PLANT | Pass | State |
| 2024-06-04 | UNIVERSITY OF CONNECTICUT - STAMFORD | Pass | State |
| 2024-05-17 | GB II CONNECTICUT, LLC - BRIDGEPORT HARBOR STATION | Pass | State |
| 2024-05-16 | GB II CONNECTICUT, LLC - BRIDGEPORT HARBOR STATION | Pass | State |
| 2024-05-14 | GB II CONNECTICUT, LLC - BRIDGEPORT HARBOR STATION | Pass | State |
| 2024-05-14 | GB II CONNECTICUT, LLC - BRIDGEPORT HARBOR STATION | Pass | State |
| 2024-05-07 | SIKORSKY AIRCRAFT - MAIN PLANT | Pass | State |
| 2024-05-07 | WHEELABRATOR BRIDGEPORT LP | Pass | State |
| 2024-05-07 | WHEELABRATOR BRIDGEPORT LP | Pass | State |
| 2024-05-07 | WHEELABRATOR BRIDGEPORT LP | Pass | State |
| 2024-05-02 | IROQUOIS PIPELINE OPERATING COMPANY - BROOKFIELD COMPRESSOR STATION | Pass | State |
| 2024-05-02 | IROQUOIS PIPELINE OPERATING COMPANY - BROOKFIELD COMPRESSOR STATION | Pass | State |
| 2024-02-25 | WATERSIDE POWER | Pass | State |
| 2024-02-24 | WATERSIDE POWER | Pass | State |
| 2024-02-24 | WATERSIDE POWER | Pass | State |
| 2024-01-04 | BOEHRINGER INGELHEIM PHARMACEUTICALS INC | Pass | State |
| 2024-01-04 | BOEHRINGER INGELHEIM PHARMACEUTICALS INC | Pass | State |
Dates as filed by the agency that recorded the stack test. Figures from EPA’s ICIS-AIR download.