EPA Air · stack tests by county and year
Air-emissions stack tests in Undetermined County, North Dakota, 2019
- 15Stack tests
A stack test measures what a source actually emits, at the stack, against the limit in its permit. Each row below is one stack test recorded against a source in Undetermined County, North Dakota during 2019. A facility can appear several times: this is the year’s record of what happened, not a list of places. The sources themselves are on the Undetermined County facility page.
Air-emissions stack tests in Undetermined County, other years
Air-emissions stack tests recorded in Undetermined County, North Dakota, 2019
| Date | Facility | Kind | Agency |
|---|---|---|---|
| 2019-11-26 | CRESTWOOD STATION 2 | Pass | U.S. EPA |
| 2019-10-29 | CRESTWOOD STATION 1 | Pass | U.S. EPA |
| 2019-08-21 | CRESTWOOD STATION 2 | Pass | U.S. EPA |
| 2019-08-20 | CRESTWOOD STATION 1 | Pass | U.S. EPA |
| 2019-08-19 | CRESTWOOD STATION 1 | Pass | U.S. EPA |
| 2019-07-10 | ASPLIN EXCAVATING INC | Pass | State |
| 2019-06-20 | ARROW PIPELINE STATION #4 | Pass | U.S. EPA |
| 2019-06-19 | CRESTWOOD STATION 2 | Pass | U.S. EPA |
| 2019-06-18 | ARROW PIPELINE STATION #3 | Pass | U.S. EPA |
| 2019-06-18 | ARROW PIPELINE STATION #3 | Pass | U.S. EPA |
| 2019-06-17 | CRESTWOOD STATION 5 | Pass | U.S. EPA |
| 2019-06-16 | CRESTWOOD STATION 5 | Pass | U.S. EPA |
| 2019-04-15 | ARROW PIPELINE STATION #4 | Pass | U.S. EPA |
| 2019-04-15 | ARROW PIPELINE STATION #4 | Pass | U.S. EPA |
| 2019-04-15 | CRESTWOOD STATION 2 | Pass | U.S. EPA |
Dates as filed by the agency that recorded the stack test. Figures from EPA’s ICIS-AIR download.