EPA Air · stack tests by state, industry and year
Utilities (NAICS 2211): stack tests in South Dakota, 2024
- 9Stack tests
A stack test measures what a source actually emits, at the stack, against the limit in its permit. Each row is one stack test recorded during 2024 at a South Dakota source whose primary industry code is NAICS 2211. A facility filing more than one industry code is counted under the first one on its record.
Utilities (NAICS 2211) in South Dakota, other years
Other industries in South Dakota, 2024
- Chemical manufacturing (NAICS 3251) 22
- Nonmetallic mineral product manufacturing (NAICS 3273) 5
- NAICS 9999 5
- Nonmetallic mineral product manufacturing (NAICS 3274) 4
- Pipeline transportation (NAICS 4862) 4
Air-emissions stack tests recorded in South Dakota, 2024
| Date | Facility | Where | Kind | Agency |
|---|---|---|---|---|
| 2024-09-11 | BASIN ELECTRIC - DEER CREEK STATION | ELKTON, Brookings, SD | Pass | State |
| 2024-08-22 | BASIN ELECTRIC POWER COOPERATIVE GROTON GENERATING | GROTON, Brown, SD | Pass | State |
| 2024-08-15 | OTTER TAIL POWER COMPANY | BIG STONE CITY, Grant, SD | Pending | State |
| 2024-08-14 | OTTER TAIL POWER COMPANY | BIG STONE CITY, Grant, SD | Pass | State |
| 2024-08-13 | OTTER TAIL POWER COMPANY | BIG STONE CITY, Grant, SD | Pass | State |
| 2024-06-11 | NORTHERN STATES POWER COMPANY | SIOUX FALLS, Minnehaha, SD | Pass | State |
| 2024-05-14 | OTTER TAIL POWER COMPANY - ASTORIA STATION | ASTORIA, Deuel, SD | Pass | State |
| 2024-05-09 | WESSINGTON SPRINGS DIESEL GENERATION PLANT | WESSINGTON SPRINGS, Jerauld, SD | Pass | State |
| 2024-04-18 | BLACK HILLS POWER, INC. (LANGE) | RAPID CITY, Pennington, SD | Pass | State |
Primary NAICS code as filed on the facility record; dates as filed by the agency that recorded the stack test. Figures from EPA’s ICIS-AIR download.
What this page shows
This page covers Clean Air Act facilities in the EPA air register with stack tests in SD for NAICS industry 2211 in 2024. It lists 9 stack tests recorded in 2024.