NPDES SDR10K147 · Clean Water Act
DOVE RIDGE ADDITION, Sioux Falls, SD: NPDES SDR10K147 discharge permit, effluent exceedances, inspections, penalties
DOVE RIDGE ADDITION, Sioux Falls, South Dakota: General permit coverage SDR10K147, held by Dove Ridge Addition; Construction stormwater; Administratively continued; issued March 3, 2021, term to March 31, 2023, by State; discharges to Sioux Falls storm sewer.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 176 were issued before SDR10K147.
Coverages issued nearest SDR10K147
- 2021-02-04: 3D SECURITY BUILDING, Sioux Falls: SDR10K154, held by 3D Security Building
- 2021-02-10: LOWER BRULE SHORELINE PROTECTION PROJECT, Lower Brule: SDR10I01I, held by Sharpe Enterprises, Inc.
- 2021-02-15: HOLIDAY STATION STORES, Rapid City: SDR10K139, held by Holiday Station Stores
- 2021-02-16: SANITARY SEWER SYSTEM IMPROVEMENTS, Sioux Falls: SDR10K140, held by Sanitary Sewer System Improvements
- 2021-03-03: BIA ROUTE 7 TO US HWY 83 IMPROVEMENT PROJECT, PH1, Rosebud: SDR10I01K, held by Rosebud Sioux Tribe Map-21 Program
- 2021-03-10: GRASSLANDS ADDITION - PHASE 3, Sioux Falls: SDR10K166, held by Grasslands Addition - Phase 3
- 2021-03-15: 2021 DOUGLAS/WASHINGTON STREETS PROJECT, Elk Point: SDR10K520, held by 2021 Douglas/Washington Streets Project
- 2021-03-22: BOX ELDER BATCH PLANT SITE GRADING, Box Elder: SDR10K203, held by Box Elder Batch Plant Site Grading
- 2021-03-29: PRAIRIE HAVEN SUBDIVISION - PHASE III, Piedmont: SDR10K548, held by Prairie Haven Subdivision - Phase III
- 2021-04-07: BRANDON 90 PLAZA, Brandon: SDR10K222, held by Brandon 90 Plaza
DOVE RIDGE ADDITION among its neighbors
97 discharge permits are in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705); SDR10K147 is one.
Other permits in the Cactus Hills-Big Sioux River subwatershed (HUC 101702031705)
- 2025 CINDER AND LIME SLURRY PONDS CLOSURE BY REMOVAL, Sioux Falls: SDR10P5PU, minor, term to 2028-10-31
- ALIBI BAR, Sioux Falls: SDR10K703, minor, term to 2023-03-31
- ARROWHEAD PARKWAY PHASE 2B @ VETERANS PARKWAY, Sioux Falls: SDR10P5ET, minor, term to 2028-10-31
- ASPEN HARBOR ADDITION, Brandon: SDR10I075, minor, term to 2023-03-31
- BIG SIOUX RECREATION OUTLET IMPROVEMENT, Brandon: SDR10P5A4, minor, term to 2028-10-31
- BRANDON CORE AREA RECONSTRUCTION, PHASE 2B, Brandon: SDR10P5A2, minor, term to 2028-10-31
- BRANDON WTP EXPANSION, Brandon: SDR10K836, minor, term to 2023-03-31
- BRANDON, CITY OF (WTP), Brandon: SDG860074, minor, term to 2021-09-30
- BURNSFIELD ADDITION, Sioux Falls: SDR10K395, minor, term to 2023-03-31
- BURWELL SITE, Sioux Falls: SDR10K864, minor, term to 2023-03-31
What stands out
- Its term runs 2 years and 28 days, March 3, 2021 to March 31, 2023; the term ended 1,264 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DOVE RIDGE ADDITION |
|---|---|
| Permittee | Dove Ridge Addition |
| NPDES ID | SDR10K147 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 3, 2021 |
| Expires | March 31, 2023 |
| Agency | State |
| Address | Sioux Falls, SD 57103 |
| Receiving water | Sioux Falls storm sewer |
| Subwatershed | Cactus Hills-Big Sioux River (HUC 101702031705) |
NPDES SDR10K147: effluent limits and exceedances
DOVE RIDGE ADDITION (NPDES SDR10K147): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10K147: no pollutant row on file.
NPDES SDR10K147: inspections, violations and enforcement
NPDES SDR10K147 (DOVE RIDGE ADDITION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10K147
NPDES SDR10K147: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10K147
NPDES SDR10K147: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.