EPA · Washington · discharge permits by parameter
Carbon disulfide in Washington
- 23Permits carrying a limit
- 0With a recorded exceedance
- 41Nationwide
A parameter is the substance or the property EPA writes a numeric limit for, and this page counts the Washington permits that carry one for Carbon disulfide: 23 permits, of which 0 have a recorded exceedance. Nationwide the same parameter appears in 41 permits. Each row below is one permit, and it opens the agency’s own record for that permit.
Permits
| Permit holder | NPDES ID | City | Program | Discharger | Receiving water |
|---|---|---|---|---|---|
| PORT OF SEATTLE TERMINAL 5 II | WAR314803 | SEATTLE | Construction stormwater | Minor | Miller Creek-Frontal East Passage |
| PORT OF SEATTLE TERMINAL 5 | WAR309748 | SEATTLE | Construction stormwater | Minor | Puget Sound |
| KING COUNTY INTERNATIONAL AIRPORT | WAR314676 | SEATTLE | Construction stormwater | Minor | Green River |
| 816 MERCER | WAR311290 | SEATTLE | Construction stormwater | Minor | Lake Washington-Sammamish River |
| TERMINAL 5 PHASE 2 PAVING | WAR315383 | SEATTLE | Construction stormwater | Minor | Miller Creek-Frontal East Passage |
| TERMINAL 18 SHORE POWER | WAR314858 | SEATTLE | Construction stormwater | Minor | Miller Creek-Frontal East Passage |
| CITY OF REDMOND EVANS CREEK RELOCATION | WAR312878 | REDMOND | Construction stormwater | Minor | Bear Creek |
| MT BAKER TOD | WAR315354 | SEATTLE | Construction stormwater | Minor | Green River |
| I-405 RENTON TO BELLEVUE ETL PROJECT | WAR308607 | RENTON | Construction stormwater | Minor | Madsen Creek-Cedar River |
| PORT OF SEATTLE 26TH AVE | WAR315148 | SEATTLE | Construction stormwater | Minor | Miller Creek-Frontal East Passage |
| FEDERAL WAY LINK EXTENSION | WAR307947 | KENT | Construction stormwater | Minor | Green River |
| SOUTH TRANSFER STATION PHASE 2 | WAR315522 | SEATTLE | Construction stormwater | Minor | Green River |
| AMTRAK PACIFIC NORTHWEST MAINTENANCE FACILITY | WAR314450 | SEATTLE | Construction stormwater | Minor | Puget Sound |
| BOEING 3 150 BOILER HOUSE | WAR315626 | SEATTLE | Construction stormwater | Minor | Green River |
| BOEING DEVELOPMENTAL CENTER | WAR315771 | TUKWILA | Construction stormwater | Minor | Green River |
| BOEING PLANT 2 LOT 2-40 737 PRODUCTION STALLS | WAR314396 | TUKWILA | Construction stormwater | Minor | Green River |
| BRIDGE POINT SEATTLE 130 | WAR315789 | SEATTLE | Construction stormwater | Minor | Green River |
| HOUGHTON CLOSED LANDFILL | WAR315665 | KIRKLAND | Construction stormwater | Minor | Lake Washington-Sammamish River |
| OLD TOWN - BLOCK 6 | WAR315238 | BELLINGHAM | Construction stormwater | Minor | Squalicum Creek-Frontal Bellingham Bay |
| OLD TOWN REDEVELOPMENT | WAR315245 | BELLINGHAM | Construction stormwater | Minor | Bellingham Bay |
| SMITH COVE PARK | WAR315207 | SEATTLE | Construction stormwater | Minor | Shell Creek-Frontal Puget Sound |
| THE TRAILHEAD | WAR315784 | ISSAQUAH | Construction stormwater | Minor | Lake Sammamish-Sammamish River |
Other pollutants in Washington
- pH, minimum 70
- Solids, total dissolved 247
- Mercury, total [as Hg] 95
- Mercury, total recoverable 3
- Mercury, tot in bot deposits [dry wgt] 5
- Depth to water level ft below landsurface 6
- 1,2-Dibromomethane 6
- Dibenzofuran, dry weight 11
- Coliform, fecal general 204
- Flow 245
- cis-1,2-Dichloroethylene 16
- 1,2,4-Trimethylbenzene 37
- Isopropylbenzene 27
- n-Propylbenzene 27
- 1,3,5-Trimethylbenzene 27
- Benzoic acids, total 14
- n-Butylbenzene 20
- Sec-butylbenzene 4
- tert-Butylbenzene 13
- 2-Methylnaphthalene 59
What this page shows
This page covers Clean Water Act discharge permits in WA with limits on the pollutant parameter Carbon disulfide. It lists 23 permits in WA with a limit on this parameter, and 13 permits in WA with a recorded violation of this parameter.