Follow this watershed Velarion Records emails you this watershed’s record, cited to the public filing, and tells you when the register changes it. Free.One more press on the next page sends it; there is no link to click in an email. The continuous daily watch on every change is the paid alert. Unsubscribe any time.
EPA · discharge permits by watershed
Watershed 1501000808
- 611Current permits
- 1States
- 6Subwatersheds
A watershed is a unit of the national Watershed Boundary Dataset, and water crosses state lines: this one carries permits in Utah. Each permit is placed by the outfall EPA names as its representative discharge point.
This watershed contains 6 subwatersheds, each with its own page of permits. The table below is a sample of the 611 current permits recorded here
By state
- Utah611
Subwatersheds inside this watershed
- Wittwer Canyon-Santa Clara River313
- Snow Canyon160
- Cove Wash-Santa Clara River115
- Halfway Wash11
- Sand Cove Wash3
- Camp Spring3
Other watersheds
- Watershed 1501000801 21
- Watershed 1501000802 3
- Watershed 1501000803 20
- Watershed 1501000804 57
- Watershed 1501000805 55
- Watershed 1501000806 7
- Watershed 1501000807 11
- Watershed 1501000809 1,176
Permits discharging here
| Permit holder | NPDES ID | City | State | Program | Discharger | Receiving water | Status and term |
|---|---|---|---|---|---|---|---|
| 104 PARKSIDE @ DESERT MOUNTAIN | UTRH02496 | TOQUERVILLE | UT | Construction stormwater | Minor | Snow Canyon | Administratively continued, 2021-03-08 to 2022-03-07 |
| 117 CRIMSON VISTA | UTRH04584 | ST. GEORGE | UT | Construction stormwater | Minor | Halfway Wash | Administratively continued, 2022-01-28 to 2023-01-27 |
| 1240 VALLEY PARK DR | UTRH10728 | SANTA CLARA | UT | Construction stormwater | Minor | Cove Wash-Santa Clara River | Effective, 2025-12-08 to 2026-12-07 |
| 167 W IVINS RESIDENCE | UTRH09631 | IVINS | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Administratively continued, 2025-04-29 to 2026-04-28 |
| 2029 RISING SUN | UTRH10678 | ST. GEORGE | UT | Construction stormwater | Minor | Snow Canyon | Effective, 2025-11-25 to 2026-11-24 |
| 2137 W SETTING SUN LN | UTRH05513 | ST. GEORGE | UT | Construction stormwater | Minor | Snow Canyon | Administratively continued, 2022-07-05 to 2023-07-04 |
| 31 CHAPARRAL RIDGE | UTRH03184 | WASHINGTON | UT | Construction stormwater | Minor | Snow Canyon | Administratively continued, 2021-06-04 to 2022-06-03 |
| 316 HILLS @ SANTA CLARA | UTRH11107 | SANTA CLARA | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Effective, 2026-03-10 to 2027-03-09 |
| 3173 SWISS | UTRH09155 | SANTA CLARA | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Administratively continued, 2025-01-30 to 2026-01-29 |
| 322 HILLS @ SANTA CLARA | UTRH06720 | SANTA CLARA | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Administratively continued, 2023-06-13 to 2024-06-12 |
| 477 W. FOXTAIL WAY, IVINS, UT 84738 | UTRC09748 | IVINS | UT | Construction stormwater | Minor | Snow Canyon | Administratively continued, 2024-10-18 to 2025-10-17 |
| 602 LEDGES | UTRH02798 | ST. GEORGE | UT | Construction stormwater | Minor | Snow Canyon | Effective, 2021-04-12 to 2022-04-11 |
| 621 LEDGES AT ST GEORGE | UTRH00368 | ST. GEORGE | UT | Construction stormwater | Minor | Snow Canyon | Effective, 2020-04-29 to 2021-04-29 |
| 698 ST GEORGE | UTRC04863 | ST. GEORGE | UT | Construction stormwater | Minor | Cove Wash-Santa Clara River | Effective, 2022-04-19 to 2023-04-18 |
| 7 BREW ST. GEORGE (SUNSET) | UTRC12985 | ST. GEORGE | UT | Construction stormwater | Minor | Cove Wash-Santa Clara River | Effective, 2026-06-15 to 2027-06-14 |
| 850 RIVERWOOD LANE SANTA CLARA, UTAH 84765 | UTRH02882 | SANTA CLARA | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Administratively continued, 2021-04-22 to 2022-04-21 |
| 91303.86 FL81 RELOC 2000FT | UTRC06179 | ST. GEORGE | UT | Construction stormwater | Minor | Halfway Wash | Effective, 2022-12-19 to 2023-12-18 |
| ABBERELY FARMS #4 | UTRC05447 | ST. GEORGE | UT | Construction stormwater | Minor | Halfway Wash | Effective, 2022-07-27 to 2023-07-26 |
| ABBOTT | UTRH08626 | IVINS | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Effective, 2024-09-19 to 2025-09-18 |
| ALTURA LOT 48 | UTRH08949 | IVINS | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Administratively continued, 2024-12-06 to 2025-12-05 |
| ALTURA PHASE 2 | UTRC01931 | IVINS | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Administratively continued, 2021-01-19 to 2022-01-18 |
| ANASAZ HILLS AT ENTRADA LOT 61 | UTRH00163 | ST. GEORGE | UT | Construction stormwater | Minor | Snow Canyon | Administratively continued, 2020-03-13 to 2021-03-13 |
| ANASAZI 16 | UTRH07379 | ST. GEORGE | UT | Construction stormwater | Minor | Snow Canyon | Effective, 2023-12-05 to 2024-12-04 |
| ANASAZI HILLS #44 | UTRH03746 | ST. GEORGE | UT | Construction stormwater | Minor | Snow Canyon | Administratively continued, 2021-08-31 to 2022-08-30 |
| ANASAZI HILLS #44 | UTRC03014 | ST. GEORGE | UT | Construction stormwater | Minor | Snow Canyon | Effective, 2021-06-21 to 2022-06-20 |
| ANASAZI HILLS 11 | UTRH00172 | ST. GEORGE | UT | Construction stormwater | Minor | Snow Canyon | Administratively continued, 2020-03-17 to 2021-03-17 |
| ANASAZI HILLS 21 | UTRH09632 | ST. GEORGE | UT | Construction stormwater | Minor | Snow Canyon | Administratively continued, 2025-04-29 to 2026-04-28 |
| ANASAZI HILLS 50 | UTRH10375 | ST. GEORGE | UT | Construction stormwater | Minor | Snow Canyon | Effective, 2025-09-23 to 2026-09-22 |
| ANASAZI VISTA | UTRC00822 | IVINS | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Administratively continued, 2023-06-28 to 2024-07-14 |
| ARCADIA | UTR380669 | SANTA CLARA | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Effective, 2021-08-10 to 2022-08-06 |
| ARROWHEAD | UTRH10526 | IVINS | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Effective, 2025-10-22 to 2026-10-21 |
| ARROWHEAD #9 | UTRH10143 | IVINS | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Administratively continued, 2025-08-11 to 2026-08-10 |
| ARROWHEAD LOT 11 | UTRH02640 | IVINS | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Administratively continued, 2021-03-23 to 2022-03-22 |
| ARROWHEAD SUBDIVISION LOT 8 | UTRH09444 | IVINS | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Effective, 2025-03-27 to 2026-03-26 |
| ARROWHEAD TRAIL SUBDIVISION | UTRC03016 | SANTA CLARA | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Administratively continued, 2021-06-21 to 2022-06-20 |
| ASCESA | UTRC07298 | ST. GEORGE | UT | Construction stormwater | Minor | Cove Wash-Santa Clara River | Administratively continued, 2023-07-25 to 2024-07-24 |
| ASCESA AT DIVARIO | UTRC04973 | ST. GEORGE | UT | Construction stormwater | Minor | Cove Wash-Santa Clara River | Administratively continued, 2022-05-04 to 2023-05-03 |
| ASCESA COURT | UTRC10128 | ST. GEORGE | UT | Construction stormwater | Minor | Cove Wash-Santa Clara River | Administratively continued, 2025-01-14 to 2026-01-13 |
| ASCESA COURT BUILDING #8 | UTRC07181 | ST. GEORGE | UT | Construction stormwater | Minor | Cove Wash-Santa Clara River | Administratively continued, 2023-07-05 to 2024-07-04 |
| AVENTURA MASS GRADING PROJECT | UTRC11715 | IVINS | UT | Construction stormwater | Minor | Wittwer Canyon-Santa Clara River | Effective, 2025-10-02 to 2026-10-01 |
What this page shows
This page covers Clean Water Act discharge permits in watershed 1501000808. It lists 611 permits in the watershed located in UT.